ÅpenKunngjøring om konkurranseVarerTED 105/2026

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Oppdragsgiver

Publisering (EUT)

2. juni 2026

Estimert verdi

95,0 mill. €

Kontraktens varighet

46.0 måneder

Prosedyretype

Forhandling med kunngjøring

Oppdragsgivers hjemsted

Gjøvik (2815) — NO020

Beskrivelse

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

CPV-koder

441600004500000045232152452321504523210045232000452313004524000045232430

Delkontrakter (1)

LOT-0001BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

44160000450000004523215245232150452321004523200045231300452400004523243046 måneder

Tildelingskriterier

Price

Flere kunngjøringer fra denne oppdragsgiveren