Procurement of geotechnical drilling rigs.
Oppdragsgiver
Publisering (EUT)
Tilbudsfrist
Prosedyretype
Oppdragsgivers hjemsted
Beskrivelse
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment includes delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
CPV-koder
Delkontrakter (1)
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment includes delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Tildelingskriterier